Inception Framing Team

Installing the I-Beam that supported the Truss system. First, we installed a 2x6 wall then the trusses were installed on top. This job was controlled by the EPA and we couldn't disturb the soils on the south end of the project. That was over 50% of the build we couldn't disturb.